Hazira LNG and Port

Port Facility Structure

Major Assets

  • 4 ASD Tugs: 2 tugs of 70mT Bollard pull each & 2 tugs of 55mT Bollard pull each.
  • 800 mtrs Long Trestle.
  • LNG berth with Mooring and Breasting Dolphins, Unloading Platform with 3 nos. Unloading arms (Chiksans), pipelines connecting the Storage tanks and Unloading Arms.
  • Two Container and Three Multipurpose berths owned and operated by AHPPL
  • Port Operations Centre with Crisis Control Room, equipped with radar, AIS VHF, Radar Tower, all navigational equipments.

Port Support and Services

  • Pilotage
  • Tugs and mooring facilities
  • Ships Stores, Crew Change
  • Immigration and Customs
  • Waste disposal

Tugs

All vessels berthing at Hazira must use the Hazira (Surat) Portís tugs operated by Adani Hazira Port Pvt Ltd (AHPPL).